HomeServicesLifting Equipment & LOLER Inspection
02 In-service Testing LOLER 1998

Lifting Equipment & LOLER Inspection

Statutory thorough examination of cranes, hoists, padeyes, slings and lifting accessories under LOLER and LEEA guidelines.

LOLER 1998 1-3 days Full asset register
Risitinerig Lifting Equipment & LOLER Inspection service for onshore and offshore drilling rigs
Thorough examination of rig lifting equipment

Lifting failures are one of the highest-consequence hazards on a rig. Our LEEA-qualified examiners provide 6- and 12-month thorough examinations, colour-code tagging and a full digital register of every lifting asset.

  • Cranes, winches & overhead hoists
  • Slings, shackles, hooks & padeyes
  • Load testing & proof load certification
  • Digital asset register & QR tagging
  • Thorough examination reports
  • Colour-code tagging & QR labels
  • Digital lifting asset register
  • Proof-load test certificates
LOLER 1998 LEEA BS EN 13414
  • Lifecycle phase02 ยท In-service Testing
  • Primary standardLOLER 1998
  • Typical duration1-3 days
  • CoverageFull asset register
  • MobilisationWithin 48 hours

Book this service

Tell us the rig, the window and the scope, and we'll come back with a quote and an inspector name in 24 hours.

Book Now

+1 (720) 860-9743

contact@risitinerig.com

How this engagement runs

From call-out to verified close-out

  1. Scope & mobilise

    We agree the asset, standard and window, then put a named inspector on the job, on the helideck within 48 hours for unplanned work.

  2. Execute to the standard

    Work is carried out strictly to LOLER 1998 and operator-specific requirements, never softened to fit a schedule.

  3. Report with evidence

    Every finding is photographed, geo-tagged and severity-ranked in a digital register you keep.

  4. Close the loop

    We track every finding through to verified resolution, nothing is closed until it's actually fixed and re-checked.